Phase I:
PRE-CONSTRUCTION

  • Signing The Contract
  • Soil Testing: Boring samples are taken of your property and tested — this is used to design your foundation.
  • Surveying and Plot Plans: Your lot is surveyed and property pins are placed. A plot plan is a scaled footprint of your home on your property based on the buyer's preferred location.  Requires buyer's approval.
  • Finalize Plans / Pre-Construction Meeting: Once your complete set of plans have been finalized, a Pre-Construction meeting will be scheduled. Foundation Engineering: The soils report and plans are sent to an engineer to design the foundation.
  • HOA / ACC Approval: Once all the required documentation is received, a package is sent to the HOA/ACC for plan approval. Requirements vary with every home.
  • Permits-Development, Building, Culvert: Applications for all required permits are completed and submitted.
  • Septic Design / Permitting: Information is sent to a registered sanitarian/site evaluator to design the septic system based on buyer's preferred location of components. Requires buyer's approval/signing off.
  • Home Registration: with TRCC, Builders Risk and Warranty

Phase II:
SITEWORK & FOUNDATION

  • Set Temporary Power: A T-Pole is set and temporary electric meter is ordered
  • Clear Your Lot: Your lot is checked, surveyor pins located, any clearing is done at this time and your lot is prepared for the pad to be built.
  • Culverts: are set
  • Build Pad site: Select fill is brought in and distributed based on the preferred location of your new home.
  • Compaction Testing: The pad is compacted and tested to verify it is at the proper compaction rate.
  • Water and Sewer Taps: Applications processed and fees paid.
  • Water Well: is made.
  • Set Foundation Forms: Form boards are set for perimeter of slab
  • Form Survey: This survey is to verify the foundation will be at the required elevation and no encroachment of building lines or easements.
  • Plumbing Grounds: Sewer pipes in the slab are set
  • Foundation Make-Up: Beams are dug, vapor barriers are set, post tension and steel rebar are set.
  • Foundation Float: Final form set, brick ledges and dropped areas
  • Foundation Inspection: Home RWC and Quality Assurance
  • Foundation Pour: Placement and finishing of concrete slab
  • Wreck Forms: 24 Hours after pour the form boards are removed
  • Rough Grade: Establish positive drainage around slab

Phase III:
FRAME

  • Frame House: House begins to take shape, skeleton erected.
  • Cornice House: Exterior sheathing, siding, walls are dried in
  • Windows and Exterior Doors: are set
  • Roof Decking: Tech Shield installed and provides surface for shingles.
  • Roof Shingles: Apply felt on decking and then shingles; house is dried in
  • Plumbing Top Out: Pipes ran through walls and attic; set water heater.
  • HVAC Rough In: Run ducts; set units in the attic
  • Electric Rough In: Wiring ran through house; Electric Walk with your Builder
  • Fireplace: Set and the chase is ran
  • Pre-Wire Alarm: Pre-wire door and window for alarm system
  • Prime and Paint Exterior: Caulk, prime and paint siding, soffits and trim
  • Punch out Frame and Mechanicals: Builder inspects and makes any necessary corrections
  • Pre-Drywall Inspections: Home RWC and Quality Assurance
  • Verify and Measure Cabinets: Ensures accuracy of cabinet dimensions prior to releasing to manufacturer
  • Insulation: After all inspections have passed and house is ready for drywall, walls and sloped ceiling are insulated.

Phase IV:
SHEETROCK & MASONRY

  • Brick - Stone - Stucco: Applied after passing frame inspections
  • Drywall - Hang, Tape, Float, Skim and Sand: Installed when insulation has been confirmed complete
  • Texture: Applied to walls and ceiling
  • Install Interior Door and Trim
  • Install Cabinets
  • Paint Interior: Wall out and Enamel--prep, prime and paint
  • Build Electric Service and Permanent Power: Run electric underground to the home
  • Install Septic System
  • Kitchen Counter Tops: Tops are measured after cabinets are installed
  • Marble Vanity Tops: Tops are measured after cabinets are installed
  • Tile: Floors and Baths first; Kitchen back splash after counter tops are in

Phase V:
MECHANICAL TRIM

  • Install Propane Tank
  • Flat Work: Driveway and Sidewalks are confirmed with your builder; then poured
  • Final Grade: Fill dirt brought in to spread with tractor; drainage established.
  • Electric Trim: Install outlets and switches; power to house
  • Install Light Fixtures
  • Plumbing Trim: Set toilets, plumbing fixtures, disposal and sinks
  • HVAC Trim: Install Grills
  • Interior Trim Punch Out: Finish interior trim; shoe moulding
  • Install Hardware: Door hardware, towel bars/rings, toilet paper holders, etc...
  • Install Mirrors and Shower Enclosures
  • Hot Punch House (mechanicals): Make sure all outlets and lights work
  • First Paint Touch - Up (before carpet is installed): Sheetrock patches; major touch ups
  • Set and Start A/C Units
  • Set Front Door
  • Weatherstrip Exterior Doors
  • Install Wood Floors
  • Install Carpet
  • Install Appliances
  • Clean House

Phase VI:
FINAL INSPECTION

  • Final Survey: This survey indicates all improvements made on your property
  • Builder Punch Out: Make necessary corrections
  • Sierra Quality Inspection: Third Party comes in after builder to help ensure higher quality
  • RWC Inspection and Final Grade Certificate
  • Home buyer Inspection (Walk through): Meet with your builder to "walk" the house and point out any items requiring repair and touch ups. You will go over a detailed check list of all the components in your new home
  • Builder Punch Out: The items on your Walk through list are addressed
  • Final Inspection: Once the items are complete, your builder will schedule a final inspection and ask you to sign off
  • Close or Final Funding: The final draw has been disbursed to Sierra Classic Homes, completing the total amount of the sales price for your new home
  • Release of Keys: You are now a happy new homeowner!